Reabilitação de esgotos sem fossa com revestimento UV Daoyunai de DN100-DN2000

Equipamento UV de CIPP
September 08, 2025
Category Connection: Equipamento UV de CIPP
Brief: Discover the Daoyunai UV Liner for trenchless sewer rehabilitation, offering a fast, eco-friendly solution for pipes ranging DN100-DN2000. This UV-cured CIPP technology minimizes disruption and ensures long-lasting repairs.
Related Product Features:
  • Tecnologia avançada sem trincheiras para reabilitação de tubos de esgoto sem escavação.
  • Utilizes UV light-cured-in-place pipe (CIPP) for fast and efficient repairs.
  • Constructed from high-strength fiberglass and UV-reactive resin for durability.
  • Seamless, jointless structure prevents leaks and root intrusion.
  • Improves hydraulic performance with a smooth internal surface.
  • Instalação rápida com cura concluída em poucas horas.
  • Ideal for municipal, industrial, and commercial applications.
  • Service life exceeding 50 years for long-term infrastructure investment.
Perguntas frequentes:
  • Qual é a gama de tamanhos de tubos que o revestimento UV Daoyunai pode reparar?
    O Daoyunai UV Liner é adequado para tubos que vão de DN100 a DN2000, tornando-o versátil para vários projetos de reabilitação de esgotos.
  • Qual a diferença entre o processo de cura por UV e os métodos tradicionais?
    A cura por UV é significativamente mais rápida do que os métodos tradicionais de vapor ou água quente, muitas vezes completando o processo em poucas horas, reduzindo o tempo de inatividade e as interrupções.
  • Quais são os principais benefícios de usar o revestimento UV Daoyunai?
    O revestimento UV Daoyunai oferece uma estrutura sem costura, sem juntas para prevenção de fugas, melhor desempenho hidráulico e uma longa vida útil de mais de 50 anos,tornando-a uma solução rentável e sustentável.